colibri-page-builder
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/quant216/public_html/wp-includes/functions.php on line 6114WHITEHORSE, YT<\/span><\/span>,\u00a0Dec. 20, 2022<\/span><\/span>\u00a0\/CNW\/ –\u00a0Minto Metals Corp. (“Minto” or the “Company”)\u00a0<\/b>(TSXV: MNTO)\u00a0is pleased to report results from the 2022 Magnetotellurics survey over the Minto Mine Property.<\/p>\n The Company commissioned Quantec Geoscience Ltd. (“Quantec”) to conduct a SPARTAN MT survey, a deep-penetrating Magnetotellurics (“MT”) survey over the Minto Mine Property (Figure 1). The goal for the MT survey was to extend the geophysical coverage for the Minto Mine Property to depths below the extents of previous geophysical surveys, diamond drilling and current mining infrastructure to assess the potential for additional economic mineralization. Quantec completed the survey, consisting of a total of 184 SPARTAN MT sites (Figure 2), between\u00a0July 10, 2022<\/span>\u00a0and\u00a0August 28, 2022<\/span>\u00a0with results received by the Company in late November 2022.<\/p>\n <\/p>\n Read complete press release here.<\/p>\n
<\/p>\n